ACTION Responsible Date Closed
Check and define the ramp rates for all magnets. G. Kirby 3-Oct-07  
Check if the required ramp rates for correctors are compatible with the correction speed needed during fast processes as snap-back W. Venturini Delsolaro 3-Oct-07  
Power the corrector circuits in Q5L8 at cold to asses how much above nominal can they run. HCC 3-Oct-07  
Routing of the warm cables connecting 120 A dipole correctors. Is it a recurrent problem? HCC 17-Oct-07  
Investigate the possibility to run the machine with a floating power converter for the RCBYH5.R4B1 circuit.
Repeat a specific HV test at cold on this circuit.
AB/PO, ElQA 17-Oct-07 29-Jan-08
Clarify the treatment of electrical non-conformities, their distribution and solving procedures. ElQA 31-Oct-07 5-Nov-07
External fault during inner triplet powering: analysis of the discharge in the PC diode. Justify the different protection of the inner triplet compared to other systems without energy extraction.
Find a possible software solution (done and included in the procedures)
AB/PO 31-Oct-07 13-Feb-08
Add athreshold and delay to the inner triplet PC to fire the heaters in a water fault only above 3000 A AB/PO 13-Feb-08 14 Apr-08
Compute or measure the current in the inner triplet magnets (not the PC) SACEC 13-Feb-08  
Renumbering of the current leads in the DFBX for the QPS system Mr. polarity and QPS 13-Feb-08 14 Apr-08
Retrieve parameters of quench heaters tested in KEK S. Feher 13-Feb-08  
Update powering procedures after the 4-5 hardware commissioning review Editors 13-Feb-08 Apr-08
Investigate failuure causes for temperature sensor electronics during ElQA AT-CRG-IN 28-Apr-08 7-May-08
Prepare acceptance procedures for the level measurement of stand-alone magnets AT/CRG-IN 7-May-08  
Study if energy extraction is required for correctors in the inner triplet M. Karpinnen, A. Verweij 7-May-08  

Pending issues to be treated by MPP in future meetings and tentative speakers: